NEWS
1. Construction preparation: Check the geomembrane and adhesive, prepare brooms, scrapers and other tools, and clean the site.
2. Treat the bonding surface: Sweep and wipe the surface to be bonded, remove impurities and dry it thoroughly.
3. Apply adhesive: Mix according to the instructions, apply evenly with a scraper or brush, with a thickness of 0.5-1mm.
4. Lamination: Align the bonding surface, lap from one end, and use a roller to vent and compact while laminating.
5. Curing and maintenance: Natural curing for 24-48 hours, avoid disturbance during the period, and then take maintenance measures such as sunshade.
6. Quality inspection: Check whether there are any defects in the appearance, use equipment to measure the peel strength, and deal with it if it does not meet the standard.
Chat Online
Africa
South Africa, Nigeria, Kenya, Zambia, Tanzania
之前